Say what you need. Watch the drawing change.
Three choices produce an illustrative footprint and a component summary, drawn against the same 192-rack facility as the rest of the site. There are no prices here and nothing is reserved — the output is a page you can take into a conversation.
12 racks drawnInside a shared row
- Racks
- 12lockable cabinets
- Design draw
- 60 kW5 kW a rack
- Share of the halls
- 5.0%of 1,200 kW design IT load
- Floor
- 300 sq ftat 25 sq ft a rack including aisle
Component summary
- Lockable cabinets, 47U usable12
- Power feeds, A and B24 × 32 A single phase
- Row segments in Hall A1 of up to 12
- Contained cold aisle1 aisle
- In-row cooling unitsNot required at this density
- Single-mode fibre pairs to the meet-me room24
- Cage boundaryNone — positions in a shared row
What we would take into the room.
Fill these in and the brief below rewrites itself. Nothing is sent, stored or reserved.
- Organisation
- —
- Contact
- —
- Requirement
- 12 lockable cabinets at 5 kW
- Total design draw
- 60 kW
- Floor allowance
- 300 sq ft
- Placement
- Hall A, 1 row segment
[Organisation] is looking at Colo Chennai, Ambattur, for 12 lockable cabinets at 5 kW. That is a total design draw of 60 kW, about 5.0% of the 1,200 kW the two halls are drawn for, and a floor allowance of 300 sq ft in 1 row segment of Hall A.
The visit should cover the power path from the substation yard to the busway, the containment in the hall, and the meet-me room on Level 0.
Illustrative sample only. Colo Chennai is a fictional showcase brand: this brief is not a quote, not a reservation and not a commitment by anyone, and no prices appear on it.
An estimate is not a quote.
Sizing a colocation footprint honestly needs a conversation about your equipment, your change windows and your growth. A slider cannot do that, and we would rather say so.
Pricing depends on term, ramp, power draw against contracted power and cross-connect count. Publishing a number a slider produced would be misleading.
The footprint drawing is illustrative. Space is only committed against a signed order and recorded in the capacity register.
Redundancy here is a unit count — three generators where two carry the load. It is not a Tier rating and not a service-level guarantee.