Sheet CC—A101Long section, looking eastScale 1:200 at A1Revision C · ConceptAmbattur, Chennai

Infrastructure you can examine.

192 racks in Ambattur, two halls, 1.2 MW of design IT load — every figure checkable against the drawing it came from.

Roof plant deck3 × 200 TR chillers (N+1)

Level 2 — Hall B96 racks · second fit-out

Level 1 — Hall A96 racks · one row of 12 shown

Level 0 — plantLT boards · UPS · meet-me room

Standby generation3 × 1,000 kVA (N+1)

Substation yard2 × 11 kV feeders

Two fibre entriesSeparate routes below grade

Title block

Colo Chennai — concept facility

Racks
192
Design IT load
1,200 kW
Built-up area
62,000 sq ft
Why a drawing and not a dashboard

Uptime figures are easy to publish. A section drawing is harder to fake.

Most colocation sites open with a number nobody can check. We would rather show you the building: where the power enters, what carries the load when it stops, how air moves through a hall and where a fibre pair actually lands.

Everything on this site is design intent for a facility at concept stage. Where a document would normally be produced — a commissioning report, an incident record, a capacity register — we have described its structure instead of claiming to hold it.

If a figure appears twice, it is the same figure. Change the rack count in the brief and the footprint drawing changes with it.

Plot1.8 acres
Halls2
Racks per hall96
Contained aisles8
High-density positions32
Hall A · Aisle 03 · sheet CC—A203
24 cabinets · 20 at 5 kW · 4 at 12.5 kW · 150 kW

Inside one contained aisle

Two overhead buswaysA feed and B feed, one per row

Every cabinet takes bothEither path carries the cabinet alone

Aisle draw at design load150 kW across 24 cabinets

Sample configuration

Pick a cabinet in the drawing to read its detail. Positions, loads and feeds are the design intent for this illustrative aisle — not a live view of an occupied hall.

Sheet CC—M301 · Hall A transverse section

Turn a system off and see what is left.

Every path that keeps a cabinet running is drawn separately, so you can follow one at a time instead of reading a diagram with everything on it at once.

Subsystems drawn
Cold air is delivered under the raised floor, enters the contained cold aisle through floor grilles and leaves through the cabinets. Nothing mixes on the way back to the CRAH return.

Utility supply2 × 11 kV · 3 × 1,250 kVA

Standby set3 × 1,000 kVA (N+1)

UPS and battery3 × 800 kVA · 10 min

To the roof deckFlow and return

Hot aisle returnNo mixing at the cabinet

Drawn: Utility supply · Standby generation · UPS and battery · Chilled water · Air path in the hall. Design IT load 1,200 kW across 192 racks.

Incomers2 × 11 kV
Transformers3 × 1,250 kVA (N+1)
Design IT load1,200 kW
Sets3 × 1,000 kVA (N+1)
Bulk fuel2 × 20,000 L
Design autonomy48 h at design load
Modules3 × 800 kVA (N+1)
Battery autonomy10 min at design load
DistributionA + B feeds to every rack
Chillers3 × 200 TR (N+1)
DistributionDual headers, ring main
ContainmentCold aisle, every aisle
ContainmentCold aisle, lid and end doors
SupplyUnder the raised floor
Cold aisle target21–25 °C at the cabinet face
Operating model · Runbook extract

Three jobs that are not the same job.

Watching a facility, responding when something goes wrong and keeping the plant serviced are separate responsibilities with separate people. Here is how each one is written down.

Six things are watched continuously. Each one has a source and a threshold, so an alarm means the same thing to everyone on shift.

WhatWhere it comes fromWhat crosses the line
Rack A and B feed currentMetered PDU, per cabinetFlag at 80% of the circuit rating
Cold aisle supply temperatureSensor at three heights per aisleFlag outside 21–25 °C
UPS module load and batteryUPS controllerFlag on module load above 80% or a battery alarm
Chilled water flow and returnHeader instrumentationFlag on a return temperature rise with steady flow
Generator readinessSet controller and fuel gaugeFlag on a failed start attempt or fuel below 60%
Hall and plant room accessDoor controllerFlag on any door held open beyond 60 seconds
Assurance · Proposed document structure

The paperwork a facility should be able to hand you.

This is a list of documents, not a list of credentials. Each one is described by what it would contain and marked as still to be prepared.

Read this before the list.

Colo Chennai is a fictional showcase brand. No item below is an audited certificate, a Tier rating or a service-level guarantee, and none has been issued by any body. They are the documents a facility at this stage would be working towards.

D01
Design intent document

Load, redundancy and topology assumptions behind every number on this site, with the calculation for each.

To be prepared
D02
Commissioning plan (L1–L5)

Factory, site, functional and integrated system testing, and what evidence each level produces.

To be prepared
D03
Operations manual

Access control, escort rules, change windows and the runbook responsibilities set out on the home page.

To be prepared
D04
Maintenance schedule

The planned works calendar, the vendor for each system and the record kept after every visit.

To be prepared
D05
Incident record format

How an event is logged, escalated, closed and reviewed, and what the customer receives afterwards.

To be prepared
D06
Capacity register

Power, cooling and space committed against installed capacity, updated when a cabinet is energised.

To be prepared

Take a rack requirement into a conversation ↗

Straight answers

Questions a buyer actually asks.

Is Colo Chennai a real facility?

No. It is a fictional brand built as a design showcase. The building, the plant list and every figure on this site are a worked example of how a colocation facility could be explained, not a description of somewhere you can buy space.

Do you hold a Tier rating or a certification?

Nothing on this site is a Tier rating, an audited certification or a service-level guarantee, and we do not display a certification mark. The assurance section lists the documents a real facility would produce, each labelled as still to be prepared.

Where do the numbers come from?

They are design intent, worked out once and reused everywhere. 192 racks across 2 halls at 160 standard and 32 high-density positions gives the 1,200 kW design IT load quoted in every drawing and summary on the site.

What does N+1 mean here?

One more unit than the design load needs. Three generators where two carry the facility, three UPS modules where two carry the IT load, three chillers where two meet the cooling load. It describes the equipment count, not an availability promise.

Is the rack brief a quote?

No. The configurator produces an illustrative footprint and a component summary you can take into a conversation. It has no prices, commits nothing and reserves nothing.

Tour enquiry

Come and check the drawings against the building.

A tour takes about ninety minutes: the yard, Level 0 plant, one hall and the meet-me room, with the design intent document open on the table afterwards.

Where
Ambattur Industrial Estate, Chennai 600058