The register.
Every job is numbered when the brief is signed. Ten are listed here: 6 complete, two on site, one in design, one a competition entry. Numbers missing from the sequence are projects that stopped before a drawing was issued.
- 09Aikya Learning CentreAuroville · School · 2023Completed
- 11Weavers' CooperativeKanchipuram · Workplace · 2022Completed
- 14House at KotturpuramChennai · House · 2021Completed
- 16Wetland Interpretation CentrePallikaranai · Public · 2024Completed
- 18Workers' Housing, 96 homesSriperumbudur · Housing · 2025On site
- 19Chettinad House RestorationKanadukathan · Restoration · 2022Completed
- 21Textile ArchiveCoimbatore · Library · 2026On site
- 23Lifeguard Posts, eightMarina Beach · Civic · 2024Completed
- 25Row HousesThiruvanmiyur · Housing · 2027In design
- 27Ward Block, CMCVellore · Healthcare · 2028Competition
Areas are built-up. The Aikya Learning Centre is written up in full; write to the studio for the drawings of any other.